Build a House in Kenya From the Diaspora — and Watch Every Milestone

NCA-supervised construction under the new National Building Code — engineer sign-offs on every critical pour, milestone-based payments you approve, and GPS-tagged proof every week.

The Rules Changed in 2025. We Build to the New Code.

The National Building Code 2024 became operative on 1 March 2025, replacing the 57-year-old by-laws of 1968. It is now the governing standard for all construction in Kenya — and every project must clear four registrations before work begins:

  • NCA Project Registration via the Online Project Registration System (OPRS) — every project must be registered before work begins
  • County building plan approval — plans submitted to the county government for review
  • NEMA clearance where applicable — environmental impact assessment
  • KEBS testing — materials must meet Kenya Bureau of Standards specifications

Contractors are classified from NCA-1 (no upper limit) through NCA-8 (capped at roughly KES 10M). We only deploy contractors whose tier matches your project value — an under-tiered crew is an under-built house.

2026 Construction Costs

Build typeFinish levelCost/m² (KES)100 m² total120 m² (3-bed) total
BungalowBasic45,000–52,0004.5M–5.2M5.4M–6.2M
BungalowStandard55,000–70,0005.5M–7.0M6.6M–8.4M
BungalowPremium75,000–90,0007.5M–9.0M9.0M–10.8M
BungalowLuxury100,000+10M+12M+
MaisonetteStandard60,000–80,0006.0M–8.0M7.2M–9.6M
Apartment block (3–5 floors)Standard55,000–67,0005.5M–6.7M—
Apartment block (6–10 floors)Standard60,000–69,0006.0M–6.9M—

Sources: IQSK Construction Cost Handbook 2025/2026, Part C; KNBS Construction Input Price Index (up 5.73% in Q2 2026); Integrum (Nairobi) reports a standard detached house at KES 59,350/m² as of October 2026 including professional fees and contingency. Budgets priced in early 2026 need rechecking.

Estimate Your Build

Estimated build cost

KES 6.6M – KES 8.4M

Indicative range using the 2026 IQSK rates above. Your quantity surveyor's bill of quantities — issued before any work begins — is the real budget baseline.

The hidden costs most diaspora budgets miss

Cost itemTypical range
County building permitKES 50,000 – 300,000 (varies by county and size)
NEMA reportKES 15,000 – 50,000
NCA project registrationKES 10,000 – 30,000
Planning searches, caveats, consent lettersKES 20,000 – 60,000
Professional fees (architect + structural engineer + quantity surveyor)10–15% of project value
Construction levy (above KES 5M)0.5% of contract value
Utility connections (water, electricity, sewer)KES 50,000 – 200,000
Contingency (mandatory per IQSK guidance)10% of project cost

How Your Build Runs — Phase by Phase

Phase 0: Pre-Construction

Weeks 1–6
Architect engagement
BORAQS-registered. 3D visualizations and approved drawings. Fee: 6–8% of project value.
Structural engineer
EBK-registered. Structural calculations, rebar schedules, concrete mix design. Fee: 3.5–4.5%.
Quantity surveyor
IQSK-registered. Detailed Bill of Quantities with itemised rates — your budget baseline.
County plan approval
Submission, review, amendment if required, approval. Typically 4–8 weeks.
NCA OPRS registration
Project registered. Contractor tier confirmed.
NEMA clearance
If applicable — for example near water bodies or forest areas.
Contractor selection
We shortlist 3 NCA-registered contractors at the correct tier. You approve. We negotiate.
Client approval gate
You review drawings, BoQ, contractor, timeline and total budget. No work begins until you sign off.

Phase 1: Foundation & Structure

Weeks 7–16
Site setting out
Surveyor sets out foundation positions; we confirm the match with approved drawings. You receive GPS-tagged photos of the set-out.
Excavation & formwork
Depth, width and formwork alignment verified. Photos + measurements.
Rebar inspection — CRITICAL
Structural engineer on-site verifies bar size, spacing, laps and stirrups before concrete is poured. You receive the engineer's sign-off certificate.
Foundation pour — CRITICAL
Engineer present, concrete mix verified, pour logged with timestamp. You receive the pour certificate plus photo and video.
Column casting
Same protocol as the foundation. Sign-off + photos.
Slab casting
Same protocol. Sign-off + photos.
Blockwork
Wall thickness, alignment and openings checked. Weekly progress report.

Phase 2: Roofing, Plumbing & Electrical

Weeks 17–24
Roof structure
Truss spacing, purlin gauge and fixing method verified.
Roof covering
Material type, overlap, flashing and ridge caps checked.
Plumbing (concealed)
Pipe material, slope and pressure test — before walls are closed.
Electrical (concealed)
Cable sizing, conduit routing and earthing, with thermal imaging on all junction boxes.
Client approval gate
You review concealed-work photos and videos. No walls are closed until you approve.

Phase 3: Finishes & Handover

Weeks 25–36
Plastering, screeding & tiling
Level, thickness, cracks, alignment, lippage and grout checked.
Painting & joinery
Coverage and colour match; doors, windows and hardware fit and operation.
Sanitary ware & final electrical
Function tests, water pressure and full circuit verification.
Final inspection
Independent Clerk of Works produces a defect register and punch list.
Snag rectification
Tracked to closure with before/after photos.
Handover
As-built drawings, warranty documentation, keys and completion certificate.

What You See Every Week

ToolFrequencyWhat you see
Client DashboardReal-timeCurrent stage, budget used, milestone status and evidence files
Live Site CameraContinuous or scheduledA 360° view — you can check in at 2 AM if you want to
Weekly Video Walk-ThroughEvery Friday (or your preferred day)A live call where the project manager walks the site and you ask questions in real time
GPS-Tagged Photo LogEvery inspection — 3×/week minimumDate, time, GPS location and description. No doctored images.
Budget TrackerUpdated weeklyFunds allocated, spent and remaining, against each BoQ line item
Defect RegisterUpdated continuouslyIssue, severity, who is assigned, target date and closure photo
Document VaultOngoingAll drawings, certificates, receipts and correspondence, accessible 24/7

Milestone-Based Payments Only

No payment is released until the corresponding work is verified complete and documented. Every payment request shows the work completed (with photos), the BoQ line items covered, the amount requested and the remaining balance. You approve or reject. We release only on your approval.

Your money never touches a personal M-Pesa account.

Our fee

8–12% of total build cost

Milestone-based over the 10–18 month build, agreed in writing before work begins. Architect, engineer and quantity surveyor fees are quoted separately and passed through at cost.

Price your build properly

Tell us the county, plot and rough size — we'll come back with a realistic budget, timeline and bill-of-quantities plan within one business day.

Book my discovery call
Al-Mas Advisory

Land verified before you pay. Homes built under your watch, from 10,000 miles away. Property managed as if it were our own — because your name is on the title, not ours.

NCA RegisteredBORAQS MemberLSK AffiliatedArdhisasa VerifiedEscrow Protected

Reach Us in Nairobi

  • Nairobi, Kenya — serving clients across the diaspora, from Boston to Birmingham to Dubai.
  • Consultations by video call, scheduled around your time zone.
  • Use the form above — every message reaches a named advisor, not a queue.
Business card of Hamisi Kusimba Salim, Managing Director of Sharq Afriqiya General Traders Limited, with direct phone number, email address and Kilifi office details
Murtaza A. Mohmedali — Managing Director

© 2026 Al-Mas Advisory. A brand of Sharq Afriqiya General Traders Limited, Kenya.

PrivacyTerms